Burbank Business Park Multi-Use Path
Installing curb and gutter, multi-use path, stormwater structures, grading, placing crushed surfacing.
Greenville Quarry and Saxton Pit
Greenville Quarry: Stripping, drill, blasting, crushing, and stockpiling of surfacing material for County maintenance projects.
Saxton Pit: Crushing and stockpiling of surfacing material for County maintenance projects.
Mill Creek Road Project, MP 1.1 to MP 3.96
This project realigns Mill Creek Road at 5 Mile Road beginning near Harbert Road matching into the construction completed just past Seven Mile Road. 5 Mile Road will also be realigned to match into Mill Creek Road which will be relocated to the top of the hill.
Reconstruct intersection to include compact roundabout and sidewalks.
Design
Bridge Guardrail Safety Improvements
Bridge rail and approach railing will be retrofit to current design standards. The project will include 3 bridges: Bussel Bridge on Old Milton Highway, Last Chance Bridge on Last Chance Road, and Paul School Bridge on Harvey Shaw Road.
Byrnes Road, MP 1.80 to MP 1.90
Repair bank that was damaged during high water events.
Deck Repair – Hart Bridge and Gose Street Bridge
Bridge deck will be repaired by modified concrete overlay on Hart Bridge on Hart Road and Gose Street Bridge on Gose Street.
Dell Sharpe Bridge on Pettyjohn Road, MP 5.20 to MP 5.80Replace existing bridge with a two-span, prestressed girder bridge.
Fishhook Park Road, MP 0.00 to MP 1.40
Fishhook Park Road will be widened and overlaid to provide paved shoulders. Clear zone will be provided with delineation.
Five Mile Bridge on Five Mile Road, MP 2.48 to MP 2.82
Replace existing bridge with a single span prestressed concrete girder bridge.
Lower Waitsburg Road will be realigned and widened to meet current design standards and provide clear zone.
Lyons Ferry Road, MP 0.20 to MP 2.65
Lyons Ferry road will be widened to provide paved shoulders and vertical and horizontal curves will be reconstructed to meet current design standards. Clear zone will be provided with delineation.
Mill Creek Flood Control Project
Notice is hereby posted to inform the public of the upcoming rehabilitation to the Mill Creek levee system. This rehabilitation is to restore damages sustained during the February 2020 flood events.
Mill Creek Road, MP 6.5 to MP 8.0
Mill Creek Road will be widened to provide paved shoulders. Clear zone will be provided with delineation.
Paxton Bridge on 3rd Ave S., MP 2.35 to MP 2.65
Replace existing bridge with a single span prestressed concrete girder bridge.
Peppers Bridge Road, MP 0.36 to MP 1.61
Peppers Bridge Road will be widened and overlaid to provide paved shoulders and reconstruct two vertical curves to meet current sight distance standards. Culverts will be lengthened and /or beveled with proper end treatments. Clear zone will be provided with delineation.
Seven Mile Bridge, on Seven Mile Road, MP 2.30 to MP 2.55
Replace existing bridge with a single-span, prestressed girder bridge.
Wallula Bridge on Wallula Avenue, MP 0.00 to MP 0.20
Replace existing bridge with a single span prestressed concrete girder bridge.